Hi Gurus
I'm working on QM-PM environment to set-up a Equipment Calibration process.
I've defined a routing for Equipment, and I've linked few Quantitative Inspection characteristics to the PM Order Operation.
When I run IP10 to schedule the Maintenance plan defined for the equipment, the system create fine a Lot Inspection.
When I try to set the inspection result using QA32/QA11 the system isssue the Error "QE503-Enter a valuation for this qualitative characteristic"
rather Inspection charactristics are defined QUANTITATIVE !!
Where is the error ??
Thanks in advance for your help.
Claudio