Hi All,
Just need some inputs from experts
a FMCG company has implemented ECC as well APO they want to choose MRP in APO or ECC
ECC
1. stock on hand position is correct only on 2nd of the month
2. Lot Schedule line as production demand is open is ECC
3. Lot of unwanted PO, PRs are open in ECC
4. Production and alternate BOMs are used
APO
PPMs are created from ECC
In simulation version
PO, PR, SIT, SIH are loaded manually and MRP run is taken as of now
Challenge - To find correct PPM for MRP run , since it is CIFed from ECC
Can some one tell pro and cons of each system ECC / APO for MRP
Regards
Umesh