Hello Experts,
We have setup WM-PP interface for a component staging.
Now we have a requirement for a particular component to be back-flushed from an IM storage location (no WM).
In other words, among the components, this particular component will be back-flushed from a non-WM manage IM storage location.
To achieve this, I updated material master to back-flush and assigned the IM Sloc in BOM and MRP2 view of material master.
However the component still has a WM sloc assigned rather than the IM storage location that I want when I created a production order.
Am I missing something here? How can I achieve this?
Any help would be appreciated!
Regards,
Eddie