Dear all,
When creating a production order, no batch is determined for one material out of several components. Our setting is automatic batch determination.
I have checked availability of this material (CO09) ==> there is enough stock
Also checked if there is a problem with the batches (BMBC) ==> no problem
Also checked material master ==> no problem
When I try releasing without defining the batch, I have an indication that this material is available but refuses to release with a message number 691 (You must enter the batch for material xxxx).
When I try to enter manually a batch number but release again rejected with message numbers 009 (Order: Release rejected) & 118 (Release of order not possible)
Thanks for your help